GGD low voltage switchgear fixed manufacturer complete set of power distribution cabinet XL-21 power cabinet in and out of line compensation cabinet
š Important Info About Product Prices & Shipping
At Bonyford , we sell all kinds of products from China to customers around the world. Here's how our pricing and shipping works:
š° Product Price = Product Only
The price you see on the app is only for the product .
Shipping cost is calculated separately.
š 2 Shipping Methods Available:
-
Standard Air Shipping ā Based on weight (good for small or urgent orders).
-
Sea Shipping ā Based on CBM (Cubic Meter) (good for large or heavy orders).
š¦ How We Calculate Your Shipping Cost:
-
After you place your order, we will bring all your items together (this is called consolidation ).
-
Then, we will check the total weight and total CBM .
-
We'll send you the cost for both air and sea shipping within 3 to 4 days .
-
You choose which shipping option you prefer.
ā° Shipping Time After Dispatch
-
Air: 7ā10 days to your country
-
Sea: 40ā50 days to your country
ā ļø Note
If you don't reply within 24 hours after we send the shipping cost,
we will automatically ship by sea (cheapest option).
šļø Thank you for using Bonyford!
Need help? Contact support anytime.
åå·ę„ä»· |
MNS low voltage cabinet, GCK switchgear, GCS low voltage cabinet, XL-21 power distribution cabinet, KYN28 cabinet, High pressure ring network inflatable cabinet, box type substation, Transformer, For inquiry, please contact customer service. |
---|